Consultation to install is often 3–8 weeks total; the on-site work for most homes is 1–2 days. Browse all guides →
Typical timeline overview
| Phase | Duration | What happens |
|---|---|---|
| Free consultation | 1–2 weeks to schedule | Measure, quote, product options |
| Manufacturing | 2–6 weeks | Custom units built to size |
| Installation | 1–2 days (most homes) | Remove, install, seal, cleanup |
| Walkthrough | Same day as install | Operation check, warranty paperwork |
What can add time
- Bay or bow windows needing structural prep
- Heritage or condo board approvals
- Peak season (late spring) with longer factory queues
- Structural repairs to rotted framing before install